广告牌钢结构工程验收应该注意什么?

所属分类:广告牌价格 发布时间:2020-07-28 来源:http://www.jnguanggaopai.com/ 浏览量:18

一、中间验收
1、 Intermediate acceptance
1、下列工程必须进行中间验收
1. Intermediate acceptance must be carried out for the following projects
(1)、落地广告牌的立柱基础、墙面广告牌的墙面支座、屋顶广告牌的柱网支座;
(1) Column foundation of floor billboard, wall support of wall billboard and column net support of roof billboard;
(2)、制作完毕出厂前的广告牌钢结构构件;
(2) The steel structure components of billboard before production are completed and delivered;
(3)、在安装现场分段组装完毕,即将整体起吊(或部分整体起吊)的钢结构。
(3) The steel structure is assembled in sections at the installation site, which is to be lifted as a whole (or partially).
2、中间验收由建设单位主持,施工单位(包括制作厂和安装队)和设计单位、质检单位参加,联合检查验收。
2. The intermediate acceptance shall be presided over by the construction unit, with the participation of the construction unit (including the manufacturer and the installation team), the design unit and the quality inspection unit, and the joint inspection and acceptance shall be conducted.
3、验收时应对被验工程进行全面检查,对照施工图和本规程的规定进行。
3. During the acceptance, a comprehensive inspection shall be carried out for the inspected project, which shall be conducted in accordance with the construction drawings and the regulations.
4、钢结构构件制作完成出厂、基础和支座、防雷和接地均要按照规程验收。
4. After the steel structure components are manufactured, the factory, foundation and support, lightning protection and grounding shall be inspected and accepted according to the regulations.
济南广告牌制作
二、竣工验收
2、 Completion acceptance
1、工程竣工验收应由建设单位主持,安装单位和设计单位参加,邀请有关的质量监督部分联合检查验收。
1. The completion acceptance of the project shall be presided over by the construction unit, participated by the installation unit and the design unit, and the relevant quality supervision department shall be invited for joint inspection and acceptance.
2、钢结构工程的安装质量必须符合有关规定。
2. The installation quality of steel structure engineering must comply with relevant regulations.
3、竣工验收应提交下列文件:
3. The following documents shall be submitted for completion acceptance:
(1)广告牌钢结构的竣工图、施工图和设计变更文件;
(1) As built drawings, construction drawings and design change documents of billboard steel structure;
(2)在安装过程中达成的协议文件;
(2) Agreement documents reached during the installation process;
(3)钢结构构件出厂验收资料;
(3) Factory acceptance data of steel structure members;
(4)基础验收资料;
(4) Basic acceptance data;
(5)安装验收和质量评定资料。
(5) Installation acceptance and quality evaluation data.
三、竣工技术文件
3、 As built technical documents
1、工程竣工后,施工单位应在两个月内项建设单位提交工程建设竣工技术资料。
1. After the completion of the project, the construction unit shall submit the project construction completion technical data within two months.
2、竣工技术文件内容及分数应符合国家《基本建设项目文件材料归档范围》的 规定。
2. The content and score of the completed technical documents shall comply with the provisions of "Filing scope of capital construction project documents".
本文的精彩内容来自: 济南广告牌制作更多的详细内容请点击我们网站:http://www.jnguanggaopai.com感谢您的阅读,可以对于本文提出您宝贵的意见.